September 2017 - Valley station
ISCHGL
Assembly station and garage, work at the facade, blacktop work, electrical installations
On 14.09.2017 the haul rope for the Palinkopf chairlift was delivered. The Palinkopf chairlift should go into operation on time for the winter season 2017/18.
More posts
0
Interested?
Suggested entries
read more