Slopes at the Silvretta Arena in Ischgl/Samnaun

Last update: *
Status Type Name Map
A1 Silvrettabahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
M 1 Idalp - middle station Silvrettabahn A1
M 1. middle station Silvrettabahn A1 - Ischgl
Journey time
11 min.
Speed
6 m/s
Drive capacity
2,810 kW
Year of construction
1998

The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.

Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.

The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.

A2 Pardatschgratbahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
S 4 F1 mountain - middle station A2
M 5 Pardatschgrat Westabf. - middlestation A2
M 5a Pardatschgrat
Journey time
9.4 min.
Speed
7.5 m/s
Drive capacity
1,880 kW
Year of construction
2014

B1 Velillbahn
Status Type/Nr. Piste Details
M 7 Velilltal - Velilleckbahn valley
E 8 Velillbahn mountain - Idalp
Journey time
4.9 min.
Speed
5 m/s
Drive capacity
470 kW
Year of construction
1995

B10 Förderband Viderböden
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
E 11 Idjoch - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

B6 Übungslift Velill
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
2.5 min.
Speed
2.5 m/s
Drive capacity
16 kW
Year of construction
1995

B7 Übungslift Viderböden
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
Journey time
1.3 min.
Speed
2.5 m/s
Drive capacity
12 kW
Year of construction
1996

B9 Förderband Übungsareal
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

C1 Höllbodenbahn
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000

C2 Höllkarbahn
Status Type/Nr. Piste Details
E 23 Palinkopf valley - Höllboden
M 24 Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998

C3 Sassgalunbahn
Status Type/Nr. Piste Details
M 25 Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997

E1 Paznauner Thayabahn
Status Type/Nr. Piste Details
M 30 Sassgalun - Paznauner Thaya
M 31 Sassgalun - Paznauner Thaya
Journey time
4.2 min.
Speed
5 m/s
Drive capacity
385 kW
Year of construction
2003

L1 Double-decker aerial tramway
Journey time
5.7 min.
Speed
10 m/s
Drive capacity
1,250 kW
Year of construction
1995

The Twinliner in Samnaun is one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars from Samnaun to Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximum speed is 10 m/s, rope diameter is 64mm.

L2 Luftseilbahn
Journey time
6 min.
Speed
10 m/s
Drive capacity
686 kW
Year of construction
1978

N2 Visnitzbahn
Status Type/Nr. Piste Details
M 65 Visnitzbahn mountain - Alp Trida
M 65a Visnitzbahn mountain - Alp Trida
M 67 Mullerbahn mountain - Alp Trida
Journey time
4.5 min.
Speed
5 m/s
Drive capacity
600 kW
Year of construction
2019

N3 Milolift (Übungslift)
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
Journey time
1.8 min.
Speed
2.5 m/s
Drive capacity
11 kW
Year of construction
1985

N6 Alp Trider Sattelbahn
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
M 69b Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000

Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.

A3 Fimbabahn
Status Type/Nr. Piste Details
M 1 Idalp - middle station Silvrettabahn A1
M 1. middle station Silvrettabahn A1 - Ischgl
M 1a valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007