The Flimsattelbahn has a vertical rise of 490 m and a route distance of 2.727 m. It departs from the base station (2.265 m) and runs over 29 pillars up to an altitude of 2.755 m. The 186 chairs are equipped with weather protection bubbles. Constructed in 1994, this facility has a total capacity of 2.400 passengers/hour. 1,1 Mio. guests per winter season use this facility mainly on their way back to Idalp from Alp Trida. The rope has a diameter of 45mm.
E3
Bodenalpbahn
Status
Type/Nr.
Piste
Details
M
36
Paznauner Thaya - Bodenalp
M
37
Bodenalpbahn mountain - A3 middle station
Journey time
5 min.
Speed
2.4 m/s
Drive capacity
190 kW
Year of construction
2000
M1
Grivaleabahn
Status
Type/Nr.
Piste
Details
M
61
Grivaleabahn valley - Samnaun Compatsch
M
76
Grivaleabahn mountain - Gravaleabahn valley
Journey time
5.3 min.
Speed
4.8 m/s
Drive capacity
432 kW
Year of construction
1996
E2
Höllspitzbahn
Status
Type/Nr.
Piste
Details
M
32
Höllspitz - Restaurant Schwarzwand
S
34
Höllspitz - Paznauner Thaya
S
35
Höllspitz - Paznauner Thaya
Journey time
6 min.
Speed
5 m/s
Drive capacity
620 kW
Year of construction
1994
N6
Alp Trider Sattelbahn
Status
Type/Nr.
Piste
Details
E
69
Alp Trida Eck - Alp Trida
M
69b
Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000
Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.