The Twinliner inSamnaunis one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars fromSamnaunto Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximumspeed is 10 m/s, rope diameter is 64mm.
L2
Luftseilbahn
Journey time
6 min.
Speed
10 m/s
Drive capacity
686 kW
Year of construction
1978
E5
Piz Val Grondabahn
Status
Type/Nr.
Piste
Details
S
41
Palinkopf - Piz Val Gronda Tal
M
42
Piz Val Gronda Bergstation - Piz Val Gronda Talstation
Journey time
5.4 min.
Speed
12 m/s
Drive capacity
620 kW
Year of construction
2013
A1
Silvrettabahn
Status
Type/Nr.
Piste
Details
M
1a
valley run - Pardatschgrat
M
1
Idalp - middle station Silvrettabahn
M
1.
middle station Silvrettabahn - Ischgl
Journey time
11 min.
Speed
6 m/s
Drive capacity
2,810 kW
Year of construction
1998
The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.
Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.
The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.
A3
Fimbabahn
Status
Type/Nr.
Piste
Details
M
1
Idalp - middle station Silvrettabahn
M
1.
middle station Silvrettabahn - Ischgl
M
1a
valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007
F2
Pardoramabahn
Status
Type/Nr.
Piste
Details
S
4
F1 mountain - middle station A2
M
5
Pardatschgrat Westabf. - middlestation A2
M
5a
Pardatschgrat
Journey time
5.4 min.
Speed
5 m/s
Drive capacity
617 kW
Year of construction
1990
N2
Visnitzbahn
Status
Type/Nr.
Piste
Details
M
65
Visnitzbahn mountain - Alp Trida
M
65a
Visnitzbahn mountain - Alp Trida
M
67
Mullerbahn mountain - Alp Trida
Journey time
4.5 min.
Speed
5 m/s
Drive capacity
600 kW
Year of construction
2019
C1
Höllbodenbahn
Status
Type/Nr.
Piste
Details
E
2
Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000
B2
Flimjochbahn
Status
Type/Nr.
Piste
Details
S
9
Flimjoch Mountain - Idalp
M
10
Flimjoch - Idalp
E
11
Idjoch - Idalp
Journey time
6.5 min.
Speed
5 m/s
Drive capacity
612 kW
Year of construction
2016
Opened in 1993, the 4-seater chairlift has a capacity of 2,400 pax/h and has successfully completed a total of 30 million rides. The Flimjoch chairlift runs from Idalp to Flimjoch at 2,752 m above sea level.
The peak times for the line are in the morning and the late afternoon. The chairlift is particularly busy during the morning when it serves to whisk visitors to the back bowl ski area of Alp Trida. In order to optimise this vital link to the Idalp-Alp Trida axis, the existing 4-seater chairlift at Flimjoch will be replaced by a modern 8-seater with a capacity of 3,200 pax/h in summer 2016. The mountain station will also be upgraded to ensure safe operation even in windy conditions. The exit area will be enclosed. This will allow the operator to open the wind-sheltered side, which can be determined depending on the wind direction.
The two underground floors of the valley station feature a chairlift garage, a filling station, a slope equipment garage and storage facilities.
B3
Idjochbahn
Status
Type/Nr.
Piste
Details
E
11
Idjoch - Idalp
M
12
Idjoch - Höllboden
Journey time
6 min.
Speed
5 m/s
Drive capacity
745 kW
Year of construction
2001
M2
Mullerbahn
Status
Type/Nr.
Piste
Details
M
61
Grivaleabahn valley - Samnaun Compatsch
M
68
Muller mountain - Muller valley
M
68a
Muller mountain - Muller valley
M
68b
Muller mountain station - Alp Trida
Journey time
3 min.
Speed
5 m/s
Drive capacity
335 kW
Year of construction
2010
N4
Viderjochbahn 1
Status
Type/Nr.
Piste
Details
E
63
Idjoch - Alp Trida
Journey time
5.2 min.
Speed
5 m/s
Drive capacity
522 kW
Year of construction
2003
N6
Alp Trider Sattelbahn
Status
Type/Nr.
Piste
Details
E
69
Alp Trida Eck - Alp Trida
M
69b
Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000
Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.