A ski resort like no other

Slopes at the Silvretta Arena in Ischgl/Samnaun

Last update: *
Status Type Name Map
N5 Alp Trider Ecklift
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
E 69a Alp Trida Eck - Alp Trida
Journey time
3.9 min.
Speed
2.5 m/s
Drive capacity
49 kW
Year of construction
1991

N6 Alp Trider Sattelbahn
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
M 69b Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000

Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.

O2 Blais Grondalift
Status Type/Nr. Piste Details
E 71 Viderjochbahn mountain - Alp Trida Eck
Journey time
3.6 min.
Speed
3.1 m/s
Drive capacity
87 kW
Year of construction
1980

E3 Bodenalpbahn
Status Type/Nr. Piste Details
M 36 Paznauner Thaya - Bodenalp
M 37 Bodenalpbahn mountain - A3 middle station
Journey time
5 min.
Speed
2.4 m/s
Drive capacity
190 kW
Year of construction
2000

L1 Doppelstöckige Pendelbahn
Journey time
5.7 min.
Speed
10 m/s
Drive capacity
1,250 kW
Year of construction
1995

The Twinliner inSamnaunis one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars fromSamnaunto Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximumspeed is 10 m/s, rope diameter is 64mm.

A3 Fimbabahn
Status Type/Nr. Piste Details
M 1 Idalp - middle station Silvrettabahn
M 1. middle station Silvrettabahn - Ischgl
M 1a valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007

B2 Flimjochbahn
Status Type/Nr. Piste Details
S 9 Flimjoch Mountain - Idalp
M 10 Flimjoch - Idalp
E 11 Idjoch - Idalp
Journey time
6.5 min.
Speed
5 m/s
Drive capacity
612 kW
Year of construction
2016

Opened in 1993, the 4-seater chairlift has a capacity of 2,400 pax/h and has successfully completed a total of 30 million rides. The Flimjoch chairlift runs from Idalp to Flimjoch at 2,752 m above sea level.

The peak times for the line are in the morning and the late afternoon. The chairlift is particularly busy during the morning when it serves to whisk visitors to the back bowl ski area of Alp Trida. In order to optimise this vital link to the Idalp-Alp Trida axis, the existing 4-seater chairlift at Flimjoch will be replaced by a modern 8-seater with a capacity of 3,200 pax/h in summer 2016. The mountain station will also be upgraded to ensure safe operation even in windy conditions. The exit area will be enclosed. This will allow the operator to open the wind-sheltered side, which can be determined depending on the wind direction.

The two underground floors of the valley station feature a chairlift garage, a filling station, a slope equipment garage and storage facilities.

N1 Flimsattelbahn
Status Type/Nr. Piste Details
E 62 Viderjoch - Alp Trida
M 62a Viderjoch - Alp Trida
Journey time
9 min.
Speed
5 m/s
Drive capacity
577 kW
Year of construction
1994

The Flimsattelbahn has a vertical rise of 490 m and a route distance of 2.727 m. It departs from the base station (2.265 m) and runs over 29 pillars up to an altitude of 2.755 m. The 186 chairs are equipped with weather protection bubbles. Constructed in 1994, this facility has a total capacity of 2.400 passengers/hour. 1,1 Mio. guests per winter season use this facility mainly on their way back to Idalp from Alp Trida. The rope has a diameter of 45mm.
 

P2 Förderband Musella 1
Journey time
1 min.
Speed
0.6 m/s
Drive capacity
6 kW
Year of construction
2012

P3 Förderband Musella 2
Journey time
1 min.
Speed
0.7 m/s
Drive capacity
6 kW
Year of construction
2012

B9 Förderband Übungsareal
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

B10 Förderband Viderböden
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
E 11 Idjoch - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

E4 Gampenbahn
Status Type/Nr. Piste Details
S 39 Palinkopf - Gampenalp
M 40 Palinkopf - Gampenalp
S 40a Gampenalp
M 40a Palinkopf - Gampenalp
E 40b Gampenbahn valley - Bodenalpe
M 40c Gampenalp
S 41 Palinkopf - Piz Val Gronda Tal
S 41. Palinkopf - Piz Val Gronda Tal
Journey time
7.87 min.
Speed
5.5 m/s
Drive capacity
1,041 kW
Year of construction
2018

B8 Gratbahn
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
3.2 min.
Speed
5 m/s
Drive capacity
420 kW
Year of construction
2002

O1 Greitspitzbahn
Status Type/Nr. Piste Details
E 64 Idjoch - Alp Trida Eck
M 70 Greitspitze - Salaas
M 70a Greitspitze - Alp Trida Eck
S 72 Greitspitze - 72a
M 72a Idjoch - Alp Trida Eck
Journey time
4.7 min.
Speed
5 m/s
Drive capacity
598 kW
Year of construction
1998

B4 Greitspitzlift
Status Type/Nr. Piste Details
S 13 start piste eleven
M 14 Greitspitze - Idjoch
Journey time
3.5 min.
Speed
2.6 m/s
Drive capacity
75 kW
Year of construction
1980

M1 Grivaleabahn
Status Type/Nr. Piste Details
M 61 Grivaleabahn valley - Samnaun Compatsch
M 76 Grivaleabahn mountain - Gravaleabahn valley
Journey time
5.3 min.
Speed
4.8 m/s
Drive capacity
432 kW
Year of construction
1996

C1 Höllbodenbahn
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000

C2 Höllkarbahn
Status Type/Nr. Piste Details
E 23 Palinkopf valley - Höllboden
M 24 Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998

E2 Höllspitzbahn
Status Type/Nr. Piste Details
M 32 Höllspitz - Restaurant Schwarzwand
S 34 Höllspitz - Paznauner Thaya
S 35 Höllspitz - Paznauner Thaya
Journey time
6 min.
Speed
5 m/s
Drive capacity
620 kW
Year of construction
1994

B3 Idjochbahn
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
M 12 Idjoch - Höllboden
Journey time
6 min.
Speed
5 m/s
Drive capacity
745 kW
Year of construction
2001

C5 Lange Wandbahn
Status Type/Nr. Piste Details
S 13 start piste eleven
S 14a Greitspitz - Höllkar
S 14b Greitspitze - Höllkar
S 14c Greitspitze - Höllkar
S 15 Greitspitze - Höllkar
Journey time
5.6 min.
Speed
5 m/s
Drive capacity
624 kW
Year of construction
2010

L2 Luftseilbahn
Journey time
6 min.
Speed
10 m/s
Drive capacity
686 kW
Year of construction
1978

N3 Milolift (Übungslift)
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
Journey time
1.8 min.
Speed
2.5 m/s
Drive capacity
11 kW
Year of construction
1985

M2 Mullerbahn
Status Type/Nr. Piste Details
M 61 Grivaleabahn valley - Samnaun Compatsch
M 68 Muller mountain - Muller valley
M 68a Muller mountain - Muller valley
M 68b Muller mountain station - Alp Trida
Journey time
3 min.
Speed
5 m/s
Drive capacity
335 kW
Year of construction
2010

P1 Musellalift
Journey time
2.6 min.
Speed
2.5 m/s
Drive capacity
60 kW
Year of construction
1984

C4 Nachtweidebahn
Status Type/Nr. Piste Details
M 2a Idalp - Nachtweide valley
E 2b ideal for beginners
Journey time
6.1 min.
Speed
4.5 m/s
Drive capacity
470 kW
Year of construction
2004

D1 Palinkopfbahn
Status Type/Nr. Piste Details
S 20 Palinkopf - Palinkopfbahn valley
S 21 Zeblasbahn mountain- Zeblasbahn valley
E 22 Palinkopf - Palinkopfbahn valley
S 33 Palinkopf - Paznauner Thaya
Journey time
5.8 min.
Speed
5 m/s
Drive capacity
576 kW
Year of construction
2017

A2 Pardatschgratbahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
S 4 F1 mountain - middle station A2
M 5 Pardatschgrat Westabf. - middlestation A2
M 5a Pardatschgrat
Journey time
9.4 min.
Speed
7.5 m/s
Drive capacity
1,880 kW
Year of construction
2014

F2 Pardoramabahn
Status Type/Nr. Piste Details
S 4 F1 mountain - middle station A2
M 5 Pardatschgrat Westabf. - middlestation A2
M 5a Pardatschgrat
Journey time
5.4 min.
Speed
5 m/s
Drive capacity
617 kW
Year of construction
1990

E1 Paznauner Thayabahn
Status Type/Nr. Piste Details
M 30 Sassgalun - Paznauner Thaya
M 31 Sassgalun - Paznauner Thaya
Journey time
4.2 min.
Speed
5 m/s
Drive capacity
385 kW
Year of construction
2003

E5 Piz Val Grondabahn
Status Type/Nr. Piste Details
S 41 Palinkopf - Piz Val Gronda Tal
M 42 Piz Val Gronda Bergstation - Piz Val Gronda Talstation
Journey time
5.4 min.
Speed
12 m/s
Drive capacity
620 kW
Year of construction
2013

C3 Sassgalunbahn
Status Type/Nr. Piste Details
M 25 Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997

G2 Schwarzwasserlift
Status Type/Nr. Piste Details
M 37 Bodenalpbahn mountain - A3 middle station
Journey time
4.5 min.
Speed
2.5 m/s
Drive capacity
19 kW
Year of construction
1999

A1 Silvrettabahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
M 1 Idalp - middle station Silvrettabahn
M 1. middle station Silvrettabahn - Ischgl
Journey time
11 min.
Speed
6 m/s
Drive capacity
2,810 kW
Year of construction
1998

The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility. Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s. The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.

B5 Sonnenbahn
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
2.8 min.
Speed
5 m/s
Drive capacity
197 kW
Year of construction
2011

G1 Übungslift Mathon
Journey time
2.7 min.
Speed
2.5 m/s
Drive capacity
45 kW
Year of construction
2009

B6 Übungslift Velill
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
2.5 min.
Speed
2.5 m/s
Drive capacity
16 kW
Year of construction
1995

B7 Übungslift Viderböden
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
Journey time
1.3 min.
Speed
2.5 m/s
Drive capacity
12 kW
Year of construction
1996