opened

slopes & Lifts

Silvretta Arena Ischgl/Samnaun
divider divider
Alle Anlagen
A1
Silvrettabahn
Status
Slope
Type
Artificially snowed
Details
valley run - Pardatschgrat
M 1a
Idalp - middle station Silvrettabahn A1
M 1
middle station Silvrettabahn A1 - Ischgl
M 1
Duration
11 Minutes
Speed
6 m/s
Power
2810 kW
Capacity
3440 persons/h
Construction year
1998
Altitude valley station
1360 m
Altitude mountain station
2321 m
Difference sea level
961 m
Length
3938 m

The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.

Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.

The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.

A2
Pardatschgratbahn
Status
Slope
Type
Artificially snowed
Details
valley run - Pardatschgrat
M 1a
F1 mountain - middle station A2
S 4
Pardatschgrat Westabf. - middlestation A2
M 5
Pardatschgrat
M 5a
Duration
9.4 Minutes
Speed
7.5 m/s
Power
1880 kW
Capacity
2800 persons/h
Construction year
2014
Altitude valley station
1365 m
Altitude mountain station
2616 m
Difference sea level
1251 m
Length
3424 m
A3
Fimbabahn
Status
Slope
Type
Artificially snowed
Details
Idalp - middle station Silvrettabahn A1
M 1
middle station Silvrettabahn A1 - Ischgl
M 1
valley run - Pardatschgrat
M 1a
Duration
15.1 Minutes
Speed
5 m/s
Power
770 kW
Capacity
2800 persons/h
Construction year
2007
Altitude valley station
1371 m
Altitude mountain station
2321 m
Difference sea level
950 m
Length
3847 m
B1
Velillbahn
Status
Slope
Type
Artificially snowed
Details
Velilltal - Velilleckbahn valley
M 7
Velillbahn mountain - Idalp
E 8
Duration
4.9 Minutes
Speed
5 m/s
Power
470 kW
Capacity
3000 persons/h
Construction year
1995
Altitude valley station
2321 m
Altitude mountain station
2602 m
Difference sea level
281 m
Length
1464 m
B2
Flimjochbahn
Status
Slope
Type
Artificially snowed
Details
Flimjoch Mountain - Idalp
S 9
Flimjoch - Idalp
M 10
Idjoch - Idalp
E 11
Duration
6.5 Minutes
Speed
5 m/s
Power
612 kW
Capacity
3200 persons/h
Construction year
2016
Altitude valley station
2298 m
Altitude mountain station
2752 m
Difference sea level
454 m
Length
1797 m

The detachable chair lift departs at 2,302 m above sea level (Idalp) and runs over 16 pillars to the Viderjoch, located at 2,756 m altitude. In winter, this facility is mainly used to support the Idjoch 8-person chair lift. The 87 chairs are equipped with comfortable seat covers, seat heating and weather protection bubbles. The facility has a total capacity of 3,200 m persons per hour. The Flimjochbahn operates from the mountain station, has a vertical rise of 454 m and a route distance of 1,797 m. Built in 2016, this lift facility boasts an average of 1,2 Mio. trips per winter season.

B3
Idjochbahn
Status
Slope
Type
Artificially snowed
Details
Idjoch - Idalp
E 11
Idjoch - Höllboden
M 12
Duration
6 Minutes
Speed
5 m/s
Power
745 kW
Capacity
3000 persons/h
Construction year
2001
Altitude valley station
2302 m
Altitude mountain station
2763 m
Difference sea level
461 m
Length
1797 m
B4
Greitspitzlift
Status
Slope
Type
Artificially snowed
Details
start piste eleven
S 13
Greitspitze - Idjoch
M 14
Duration
3.5 Minutes
Speed
2.6 m/s
Power
75 kW
Capacity
1426 persons/h
Construction year
1980
Altitude valley station
2753 m
Altitude mountain station
2874 m
Difference sea level
121 m
Length
548 m
B5
Sonnenbahn
Status
Slope
Type
Artificially snowed
Details
Pardatschgrat - Idalp
E 6
Duration
2.8 Minutes
Speed
5 m/s
Power
197 kW
Capacity
2400 persons/h
Construction year
2011
Altitude valley station
2306 m
Altitude mountain station
2434 m
Difference sea level
128 m
Length
646 m
B6
Übungslift Velill
Status
Slope
Type
Artificially snowed
Details
Pardatschgrat - Idalp
E 6
Duration
2.5 Minutes
Speed
2.5 m/s
Power
16 kW
Capacity
720 persons/h
Construction year
1995
Altitude valley station
2320 m
Altitude mountain station
2371 m
Difference sea level
51 m
Length
375 m
B7
Übungslift Viderböden
Status
Slope
Type
Artificially snowed
Details
Idjoch - Idalp
E 11
Duration
1.3 Minutes
Speed
2.5 m/s
Power
12 kW
Capacity
711 persons/h
Construction year
1996
Altitude valley station
2316 m
Altitude mountain station
2348 m
Difference sea level
32 m
Length
200 m
B8
Gratbahn
Status
Slope
Type
Artificially snowed
Details
Pardatschgrat - Idalp
E 6
Duration
3.2 Minutes
Speed
5 m/s
Power
420 kW
Capacity
2350 persons/h
Construction year
2002
Altitude valley station
2307 m
Altitude mountain station
2625 m
Difference sea level
318 m
Length
970 m
B9
Förderband Übungsareal
Status
Slope
Type
Artificially snowed
Details
Pardatschgrat - Idalp
E 6
Duration
1.5 Minutes
Speed
0.9 m/s
Power
11 kW
Capacity
1950 persons/h
Construction year
2011
Altitude valley station
2324 m
Altitude mountain station
2331 m
Difference sea level
7 m
Length
80 m
B10
Förderband Viderböden
Status
Slope
Type
Artificially snowed
Details
Idalp - Höllboden
E 2
Idjoch - Idalp
E 11
Duration
1.5 Minutes
Speed
0.9 m/s
Power
11 kW
Capacity
1950 persons/h
Construction year
2011
Altitude valley station
2314 m
Altitude mountain station
2323 m
Difference sea level
9 m
Length
80 m
C1
Höllbodenbahn
Status
Slope
Type
Artificially snowed
Details
Idalp - Höllboden
E 2
Duration
3.4 Minutes
Speed
4.5 m/s
Power
410 kW
Capacity
3700 persons/h
Construction year
2000
Altitude valley station
2142 m
Altitude mountain station
2326 m
Difference sea level
184 m
Length
917 m
C2
Höllkarbahn
Status
Slope
Type
Artificially snowed
Details
Palinkopf valley - Höllboden
E 23
Höllkarbahn mountain - Höllkarbahn valley
M 24
Duration
5.5 Minutes
Speed
5 m/s
Power
560 kW
Capacity
3200 persons/h
Construction year
1998
Altitude valley station
2145 m
Altitude mountain station
2471 m
Difference sea level
326 m
Length
1650 m
C3
Sassgalunbahn
Status
Slope
Type
Artificially snowed
Details
Sassgalun - Höllboden
M 25
Duration
3.5 Minutes
Speed
1.8 m/s
Power
160 kW
Capacity
2240 persons/h
Construction year
1997
Altitude valley station
2141 m
Altitude mountain station
2282 m
Difference sea level
141 m
Length
380 m
C4
Nachtweidebahn
Status
Slope
Type
Artificially snowed
Details
Idalp - Nachtweide valley
M 2a
ideal for beginners
E 2b
Duration
6.1 Minutes
Speed
4.5 m/s
Power
470 kW
Capacity
2400 persons/h
Construction year
2004
Altitude valley station
2089 m
Altitude mountain station
2446 m
Difference sea level
357 m
Length
1645 m
C5
Lange Wandbahn
Status
Slope
Type
Artificially snowed
Details
start piste eleven
S 13
Greitspitz - Höllkar
S 14a
Greitspitze - Höllkar
S 14b
Greitspitze - Höllkar
S 14c
Greitspitze - Höllkar
S 15
Duration
5.6 Minutes
Speed
5 m/s
Power
624 kW
Capacity
2400 persons/h
Construction year
2010
Altitude valley station
2221 m
Altitude mountain station
2853 m
Difference sea level
632 m
Length
1545 m
D1
Palinkopfbahn
Status
Slope
Type
Artificially snowed
Details
Palinkopf - Palinkopfbahn valley
S 20
Zeblasbahn mountain- Zeblasbahn valley
S 21
Palinkopf - Palinkopfbahn valley
E 22
Palinkopf - Paznauner Thaya
S 33
Duration
5.8 Minutes
Speed
5 m/s
Power
576 kW
Capacity
2800 persons/h
Construction year
2017
Altitude valley station
2413 m
Altitude mountain station
2853 m
Difference sea level
440 m
Length
1577 m
D2
Zeblasbahn
Status
Slope
Type
Artificially snowed
Details
Palinkopf - Palinkopfbahn valley
S 20
Zeblasbahn mountain- Zeblasbahn valley
S 21
Palinkopf - Palinkopfbahn valley
E 22
Palinkopf - Paznauner Thaya
S 33
Duration
4.9 Minutes
Speed
5 m/s
Power
510 kW
Capacity
2400 persons/h
Construction year
2000
Altitude valley station
2416 m
Altitude mountain station
2791 m
Difference sea level
375 m
Length
1481 m
E1
Paznauner Thayabahn
Status
Slope
Type
Artificially snowed
Details
Sassgalun - Paznauner Thaya
M 30
Sassgalun - Paznauner Thaya
M 31
Duration
4.2 Minutes
Speed
5 m/s
Power
385 kW
Capacity
2400 persons/h
Construction year
2003
Altitude valley station
1973 m
Altitude mountain station
2272 m
Difference sea level
299 m
Length
1256 m
E2
Höllspitzbahn
Status
Slope
Type
Artificially snowed
Details
Höllspitz - Restaurant Schwarzwand
M 32
Höllspitz - Paznauner Thaya
S 34
Höllspitz - Paznauner Thaya
S 35
Duration
6 Minutes
Speed
5 m/s
Power
620 kW
Capacity
2400 persons/h
Construction year
1994
Altitude valley station
1994 m
Altitude mountain station
2639 m
Difference sea level
645 m
Length
1792 m
E3
Bodenalpbahn
Status
Slope
Type
Artificially snowed
Details
Paznauner Thaya - Bodenalp
M 36
Bodenalpbahn mountain - A3 middle station
M 37
Duration
5 Minutes
Speed
2.4 m/s
Power
190 kW
Capacity
1615 persons/h
Construction year
2000
Altitude valley station
1834 m
Altitude mountain station
2150 m
Difference sea level
316 m
Length
726 m
E4
Gampenbahn
Status
Slope
Type
Artificially snowed
Details
Palinkopf - Gampenalp
S 39
Palinkopf - Gampenalp
M 40
Gampenalp
S 40a
Palinkopf - Gampenalp
M 40a
Gampenbahn valley - Bodenalpe
E 40b
Gampenalp
M 40c
Palinkopf - Piz Val Gronda Tal
S 41
Palinkopf - Piz Val Gronda Tal
S 41
Duration
7.87 Minutes
Speed
5.5 m/s
Power
1041 kW
Capacity
2800 persons/h
Construction year
2018
Altitude valley station
1924 m
Altitude mountain station
2848 m
Difference sea level
924 m
Length
2416 m
E5
Piz Val Grondabahn
Status
Slope
Type
Artificially snowed
Details
Palinkopf - Piz Val Gronda Tal
S 41
Piz Val Gronda Bergstation - Piz Val Gronda Talstation
M 42
Duration
5.4 Minutes
Speed
12 m/s
Power
620 kW
Capacity
1300 persons/h
Construction year
2013
Altitude valley station
2295 m
Altitude mountain station
2811.5 m
Difference sea level
516.5 m
Length
2452 m
F1
Velilleckbahn
Status
Slope
Type
Artificially snowed
Details
F1 mountain - middle station A2
S 4
Velilleckbahn mountain - Velilleckbahn valley
S 4a
Velilltal - Velilleckbahn valley
M 7
Velilleckbahn valley - Pardatschgrat valley
S 7a
Velill valley
S 7a
Duration
5.9 Minutes
Speed
6 m/s
Power
661 kW
Capacity
2400 persons/h
Construction year
2019
Altitude valley station
2048 m
Altitude mountain station
2620 m
Difference sea level
572 m
Length
1948 m
F2
Pardoramabahn
Status
Slope
Type
Artificially snowed
Details
F1 mountain - middle station A2
S 4
Pardatschgrat Westabf. - middlestation A2
M 5
Pardatschgrat
M 5a
Duration
5.4 Minutes
Speed
5 m/s
Power
617 kW
Capacity
1750 persons/h
Construction year
1990
Altitude valley station
1889 m
Altitude mountain station
2624 m
Difference sea level
735 m
Length
1600 m
G1
Übungslift Mathon
Duration
2.7 Minutes
Speed
2.5 m/s
Power
45 kW
Capacity
1195 persons/h
Construction year
2009
Altitude valley station
1463 m
Altitude mountain station
1558 m
Difference sea level
95 m
Length
449 m
G2
Schwarzwasserlift
Status
Slope
Type
Artificially snowed
Details
Bodenalpbahn mountain - A3 middle station
M 37
Duration
4.5 Minutes
Speed
2.5 m/s
Power
19 kW
Capacity
723 persons/h
Construction year
1999
Altitude valley station
1697 m
Altitude mountain station
1687 m
Length
681 m
L1
Double-decker aerial tramway
Duration
5.7 Minutes
Speed
10 m/s
Power
1250 kW
Capacity
1620 persons/h
Construction year
1995
Altitude valley station
1789 m
Altitude mountain station
2511 m
Difference sea level
722 m
Length
2269 m

The Twinliner in Samnaun is one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars from Samnaun to Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximum speed is 10 m/s, rope diameter is 64mm.

L2
Luftseilbahn
Duration
6 Minutes
Speed
10 m/s
Power
686 kW
Capacity
800 persons/h
Construction year
1978
Altitude valley station
1790 m
Altitude mountain station
2510 m
Difference sea level
720 m
Length
2297 m
M1
Grivaleabahn
Status
Slope
Type
Artificially snowed
Details
Grivaleabahn valley - Samnaun Compatsch
M 61
Grivaleabahn mountain - Gravaleabahn valley
M 76
Duration
5.3 Minutes
Speed
4.8 m/s
Power
432 kW
Capacity
2600 persons/h
Construction year
1996
Altitude valley station
2314 m
Altitude mountain station
2657 m
Difference sea level
343 m
Length
1532 m
M2
Mullerbahn
Status
Slope
Type
Artificially snowed
Details
Grivaleabahn valley - Samnaun Compatsch
M 61
Muller mountain - Muller valley
M 68
Muller mountain - Muller valley
M 68a
Muller mountain station - Alp Trida
M 68b
Duration
3 Minutes
Speed
5 m/s
Power
335 kW
Capacity
3000 persons/h
Construction year
2010
Altitude valley station
2306 m
Altitude mountain station
2509 m
Difference sea level
203 m
Length
792 m
N1
Flimsattelbahn
Status
Slope
Type
Artificially snowed
Details
Viderjoch - Alp Trida
E 62
Viderjoch - Alp Trida
M 62a
Duration
9 Minutes
Speed
5 m/s
Power
577 kW
Capacity
2400 persons/h
Construction year
1994
Altitude valley station
2265 m
Altitude mountain station
2754 m
Difference sea level
489 m
Length
2695 m

The Flimsattelbahn has a vertical rise of 490 m and a route distance of 2.727 m. It departs from the base station (2.265 m) and runs over 29 pillars up to an altitude of 2.755 m. The 186 chairs are equipped with weather protection bubbles. Constructed in 1994, this facility has a total capacity of 2.400 passengers/hour. 1,1 Mio. guests per winter season use this facility mainly on their way back to Idalp from Alp Trida. The rope has a diameter of 45mm.
 

N2
Visnitzbahn
Status
Slope
Type
Artificially snowed
Details
Visnitzbahn mountain - Alp Trida
M 65
Visnitzbahn mountain - Alp Trida
M 65a
Mullerbahn mountain - Alp Trida
M 67
Duration
4.5 Minutes
Speed
5 m/s
Power
600 kW
Capacity
3500 persons/h
Construction year
2019
Altitude valley station
2261 m
Altitude mountain station
2633 m
Difference sea level
372 m
Length
1208 m
N3
Milolift (Übungslift)
Status
Slope
Type
Artificially snowed
Details
Alp Trida Eck - Alp Trida
E 69
Duration
1.8 Minutes
Speed
2.5 m/s
Power
11 kW
Capacity
792 persons/h
Construction year
1985
Altitude valley station
2264 m
Altitude mountain station
2289 m
Difference sea level
25 m
Length
282 m
N4
Viderjochbahn 1
Status
Slope
Type
Artificially snowed
Details
Idjoch - Alp Trida
E 63
Duration
5.2 Minutes
Speed
5 m/s
Power
522 kW
Capacity
3000 persons/h
Construction year
2003
Altitude valley station
2266 m
Altitude mountain station
2609 m
Difference sea level
343 m
Length
1549 m
N5
Alp Trider Ecklift
Status
Slope
Type
Artificially snowed
Details
Alp Trida Eck - Alp Trida
E 69
Alp Trida Eck - Alp Trida
E 69a
Duration
3.9 Minutes
Speed
2.5 m/s
Power
49 kW
Capacity
1000 persons/h
Construction year
1991
Altitude valley station
2377 m
Altitude mountain station
2510 m
Difference sea level
133 m
Length
580 m
N6
Alp Trider Sattelbahn
Status
Slope
Type
Artificially snowed
Details
Alp Trida Eck - Alp Trida
E 69
Alp Trida Eck - Alp Trida
M 69b
Duration
3.4 Minutes
Speed
5 m/s
Power
318 kW
Capacity
2800 persons/h
Construction year
2000
Altitude valley station
2276 m
Altitude mountain station
2505 m
Difference sea level
229 m
Length
1024 m

Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.

N7
Alp Trida Förderband
Duration
1 Minutes
Speed
0.6 m/s
Power
3 kW
Capacity
900 persons/h
Construction year
2003
Altitude valley station
2277 m
Altitude mountain station
2278 m
Difference sea level
1 m
Length
30 m
O1
Greitspitzbahn
Status
Slope
Type
Artificially snowed
Details
Idjoch - Alp Trida Eck
E 64
Greitspitze - Salaas
M 70
Greitspitze - Alp Trida Eck
M 70a
Greitspitze - 72a
S 72
Idjoch - Alp Trida Eck
M 72a
Duration
4.7 Minutes
Speed
5 m/s
Power
598 kW
Capacity
2800 persons/h
Construction year
1998
Altitude valley station
2458 m
Altitude mountain station
2872 m
Difference sea level
414 m
Length
1407 m
O2
Blais Grondalift
Status
Slope
Type
Artificially snowed
Details
Viderjochbahn mountain - Alp Trida Eck
E 71
Duration
3.6 Minutes
Speed
3.1 m/s
Power
87 kW
Capacity
1000 persons/h
Construction year
1980
Altitude valley station
2456 m
Altitude mountain station
2598 m
Difference sea level
142 m
Length
775 m
O4
Viderjochbahn 2
Status
Slope
Type
Artificially snowed
Details
Idjoch - Alp Trida Eck
E 64
Idjoch - Alp Trida Eck
M 72a
Duration
4.3 Minutes
Speed
5 m/s
Power
503 kW
Capacity
3000 persons/h
Construction year
2004
Altitude valley station
2462 m
Altitude mountain station
2756 m
Difference sea level
294 m
Length
1299 m
P1
Musellalift
Duration
2.6 Minutes
Speed
2.5 m/s
Power
60 kW
Capacity
851 persons/h
Construction year
1984
Altitude valley station
1840 m
Altitude mountain station
1920 m
Difference sea level
80 m
Length
400 m
P2
Förderband Musella 1
Duration
1 Minutes
Speed
0.6 m/s
Power
6 kW
Capacity
950 persons/h
Construction year
2012
Altitude valley station
1835 m
Altitude mountain station
1848 m
Difference sea level
13 m
Length
57 m
P3
Förderband Musella 2
Duration
1 Minutes
Speed
0.7 m/s
Power
6 kW
Capacity
950 persons/h
Construction year
2012
Altitude valley station
1837 m
Altitude mountain station
1844 m
Difference sea level
7 m
Length
39 m
Last update 02.05.2024 22:50