02/10/2014 / 3-S Pardatschgrat A2

September 2014 - Valley station

Work at the valley station of the 3-S Pardatschgrat in September

  • concrete work in the infrastructure section
  • assembly of the rolling stock
  • teardown of the old ski bridge
  • roof sealing work in the cable car section
  • work at the glass facade
  • start of the ropeway technical initial operation
  • interior construction of the infrastructure section
  • Assembly of the ski bridge at the station platform level