Status Type Name Map
A1 Silvrettabahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
M 1 Idalp - middle station Silvrettabahn
M 1. middle station Silvrettabahn - Ischgl
Journey time
11 min.
Speed
6 m/s
Drive capacity
2,810 kW
Year of construction
1998

The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.

Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.

The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.

A2 Pardatschgratbahn
Status Type/Nr. Piste Details
M 1a valley run - Pardatschgrat
S 4 F1 mountain - middle station A2
M 5 Pardatschgrat Westabf. - middlestation A2
M 5a Pardatschgrat
Journey time
9.4 min.
Speed
7.5 m/s
Drive capacity
1,880 kW
Year of construction
2014

A3 Fimbabahn
Status Type/Nr. Piste Details
M 1 Idalp - middle station Silvrettabahn
M 1. middle station Silvrettabahn - Ischgl
M 1a valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007

B1 Velillbahn
Status Type/Nr. Piste Details
M 7 Velilltal - Velilleckbahn valley
E 8 Velillbahn mountain - Idalp
Journey time
4.9 min.
Speed
5 m/s
Drive capacity
470 kW
Year of construction
1995

B10 Förderband Viderböden
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
E 11 Idjoch - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

B2 Flimjochbahn
Status Type/Nr. Piste Details
S 9 Flimjoch Mountain - Idalp
M 10 Flimjoch - Idalp
E 11 Idjoch - Idalp
Journey time
6.5 min.
Speed
5 m/s
Drive capacity
612 kW
Year of construction
2016

Opened in 1993, the 4-seater chairlift has a capacity of 2,400 pax/h and has successfully completed a total of 30 million rides. The Flimjoch chairlift runs from Idalp to Flimjoch at 2,752 m above sea level.

The peak times for the line are in the morning and the late afternoon. The chairlift is particularly busy during the morning when it serves to whisk visitors to the back bowl ski area of Alp Trida. In order to optimise this vital link to the Idalp-Alp Trida axis, the existing 4-seater chairlift at Flimjoch will be replaced by a modern 8-seater with a capacity of 3,200 pax/h in summer 2016. The mountain station will also be upgraded to ensure safe operation even in windy conditions. The exit area will be enclosed. This will allow the operator to open the wind-sheltered side, which can be determined depending on the wind direction.

The two underground floors of the valley station feature a chairlift garage, a filling station, a slope equipment garage and storage facilities.

B3 Idjochbahn
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
M 12 Idjoch - Höllboden
Journey time
6 min.
Speed
5 m/s
Drive capacity
745 kW
Year of construction
2001

B4 Greitspitzlift
Status Type/Nr. Piste Details
S 13 start piste eleven
M 14 Greitspitze - Idjoch
Journey time
3.5 min.
Speed
2.6 m/s
Drive capacity
75 kW
Year of construction
1980

B5 Sonnenbahn
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
2.8 min.
Speed
5 m/s
Drive capacity
197 kW
Year of construction
2011

B6 Übungslift Velill
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
2.5 min.
Speed
2.5 m/s
Drive capacity
16 kW
Year of construction
1995

B7 Übungslift Viderböden
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
Journey time
1.3 min.
Speed
2.5 m/s
Drive capacity
12 kW
Year of construction
1996

B8 Gratbahn
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
3.2 min.
Speed
5 m/s
Drive capacity
420 kW
Year of construction
2002

B9 Förderband Übungsareal
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

C1 Höllbodenbahn
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000

C2 Höllkarbahn
Status Type/Nr. Piste Details
E 23 Palinkopf valley - Höllboden
M 24 Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998

C3 Sassgalunbahn
Status Type/Nr. Piste Details
M 25 Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997

C4 Nachtweidebahn
Status Type/Nr. Piste Details
M 2a Idalp - Nachtweide valley
E 2b ideal for beginners
Journey time
6.1 min.
Speed
4.5 m/s
Drive capacity
470 kW
Year of construction
2004

C5 Lange Wandbahn
Status Type/Nr. Piste Details
S 13 start piste eleven
S 14a Greitspitz - Höllkar
S 14b Greitspitze - Höllkar
S 14c Greitspitze - Höllkar
S 15 Greitspitze - Höllkar
Journey time
5.6 min.
Speed
5 m/s
Drive capacity
624 kW
Year of construction
2010

D1 Palinkopfbahn
Status Type/Nr. Piste Details
S 20 Palinkopf - Palinkopfbahn valley
S 21 Zeblasbahn mountain- Zeblasbahn valley
E 22 Palinkopf - Palinkopfbahn valley
S 33 Palinkopf - Paznauner Thaya
Journey time
5.8 min.
Speed
5 m/s
Drive capacity
576 kW
Year of construction
2017

D2 Zeblasbahn
Status Type/Nr. Piste Details
S 20 Palinkopf - Palinkopfbahn valley
S 21 Zeblasbahn mountain- Zeblasbahn valley
E 22 Palinkopf - Palinkopfbahn valley
S 33 Palinkopf - Paznauner Thaya
Journey time
4.9 min.
Speed
5 m/s
Drive capacity
510 kW
Year of construction
2000