The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.
Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.
The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.
G2
Schwarzwasserlift
Status
Type/Nr.
Piste
Details
M
37
Bodenalpbahn mountain - A3 middle station
Journey time
4.5 min.
Speed
2.5 m/s
Drive capacity
19 kW
Year of construction
1999
C3
Sassgalunbahn
Status
Type/Nr.
Piste
Details
M
25
Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997
E5
Piz Val Grondabahn
Status
Type/Nr.
Piste
Details
S
41
Palinkopf - Piz Val Gronda Tal
M
42
Piz Val Gronda Bergstation - Piz Val Gronda Talstation